Bed leveling & negative-pressure ink-line bleeding for UV flatbed
Installation Applies to: UV-6090 Flatbed · 198 views
1. Level all four corners of the bed within 0.2mm.
2. Set negative pressure to -3.0 ~ -4.0 kPa.
3. Open the subtank bleed valve and press the damper gently until bubble-free ink flows.
4. Stir white ink 10 minutes before bleeding.
5. Print color blocks to confirm even output.