First heat-up & blanket installation for the roll sublimation calender
Installation Applies to: SUB-1800 Roll Sublimasi · 231 views
1. Clean the drum before fitting the blanket.
2. Thread the blanket centered with even tension (scale 4-5).
3. First heat-up: hold 80°C for 30 min to dehumidify, then ramp to 200°C.
4. Dry-run 10 min and watch for blanket drift; adjust the tracking knob.
5. Transfer at 200-210°C, start at 1.2-1.5 m/min.